/> Scottish Region (North) Home | How to use this site | Introduction to the Sectional Appendix | National Routes | Example Page | Abbreviations | Links | My Book Collection | Contact me

Ballinluig to Aberfeldy

Section of Line Opened Closed Notes
Throughout 03.07.1865
Throughout 25.01.1965 (G)
Throughout 03.05.1965 (P)
Junctions and other features Running Lines Stations, Signal Boxes and Junctions Distance from Signal Box above Loops and Refuge Sidings Notes
Maximum permissible speed 40 m.p.h.
1 Ballinluig South
Balnaguard Halt c. 03.05.1965
Grandtully c. 03.05.1965
2 Aberfeldy Station 8m 1298yds c. 03.05.1965

Links