/>
Section of Line | Opened | Closed | Notes |
---|---|---|---|
(Gatewen Colliery Siding to Plas Power) | 30.11.1954 (G) | ||
Throughout | 1966 (G) |
Junctions and other features | Running Lines | Stations, Signal Boxes and Junctions | Distance from Signal Box above | Loops and Refuge Sidings | Notes | |
---|---|---|---|---|---|---|
1 | ↕ | Brymbo Junction | – | |||
— | ↕ | Gatewen Colliery Siding |